18 C.F.R. §358.7(i) requires a Transmission Provider to post information detailing the circumstances and manner in which the Transmission Provider grants a waiver of a tariff provision in favor of an affiliate within 24 hours.
Granted a Btu waiver allowing BP America Production up to 1400 for the Thunder Horse receipt point.